Mirage · Single Source of Truth · New Plan Lock · Jun 2026

This page overrides every other document. Where any page disagrees with this one, this one wins. The concept is two prefab-steel (PEMB) load-bearing buildings on slab-on-grade — permanent commercial construction only.

CANONICAL · SUPERSEDES ALL PRIOR LOCKS

1 · The site (flag lot PLS #8387 · 1705 Manhattan Blvd)

2 · Buildings (both prefab steel · openings pre-cut · shells ~$100k)

BuildingFootprintEaveProgram
Mirage social hall120′×60′ = 7,200 SF (rev Jul 2026)16′cloud kitchen (NW) + 34′ bar + dining/lounge + dance floor + stage + RR
Retail strip150′×50′ = 7,500 SF12′10 units @ 750 SF (15′×50′), storefronts face east onto parking

Both are PEMB prefab steel (standing-seam roof + insulated panel), delivered as shells with rough openings cut, ready for windows + doors. The ~$100k figure is the two steel kits only — slab, erection, MEP, HVAC, kitchen core, drainage, parking, permits are separate (see GC Build Budget sheet).

3 · Cloud kitchen (inside the hall, NW corner)

4 · MEP & cost basis (cheapest compliant)

5 · What is DEAD (purge on sight)

KILL (old / wrong)REPLACE WITH (new plan)
Portable storage · pop-up modules · REV-H district layouts · Lot Z drawingsTwo prefab-steel (PEMB) buildings
8 shells / 8 bays · ~960 SF/shell · strip on the EAST10 units @ 750 SF · strip on the WEST fronting parking
80′×60′ / 100′×48′ Mirage120′×60′ Mirage hall (16′ eave) · 7,200 SF
30×48 / 48×30 / 50×30 kitchen · 36′ bar42×30 kitchen · 34′ bar
42′ hood / “exhaust west”28′ Type I hood (P2–P5) · roof-up exhaust
“Hall on the west” · shops in the courtyardHall center · court behind hall · shops on the west out of the court

Public-facing language: say prefabricated steel modular commercial building or permanent prefab-steel (PEMB) construction — not portable storage or temporary structures.

6 · Occupant load — capped at 299 (deliberate · Jul 2026)

Owner decision recorded Jul 4 2026. 299 is the everyday operating ceiling; anything above 300 is a phase-2 move gated on the NE easement.

7 · Charrette fixes applied (Jul 2026)

9 · Capital · REV H7 (Jul 2026 lock)

Authority: docs/1705-MANHATTAN-CAPITAL-STACK-REV-H7-LOCK.md · Investor GC ROM $1.8M remains separate audience.

8 · Document authority chain

TopicFile
Interior / seats1705-MIRAGE-HALL-ZERO-WASTE-LAYOUT.html
Floor plan A1.11705-MIRAGE-HALL-A1-1-FLOOR-PLAN.svg
Mirage Grand Arrival1705-MIRAGE-GRAND-ARRIVAL-INVESTOR.html · 1705-GLOW-THROAT-GRAND-BUILD-SHEET.html · ~$45k @ CO
Capital REV H7docs/1705-MANHATTAN-CAPITAL-STACK-REV-H7-LOCK.md · ~$1.265M all-in · land $350k max
Turn-in visuals1705-TURN-IN-WINNER.html · legacy internal renders
Jefferson stamp-only hub1705-JEFFERSON-STAMP-ONLY-COMMAND-CENTER.html
Code enforcement red team1705-CODE-ENFORCEMENT-RED-TEAM-AUDIT.html
Full permit set (18 sheets · Rev 4)1705-MIRAGE-HALL-PERMIT-DRAWING-SET.html
Building engineering H21705-BUILDING-CODE-SCALED-SKETCH.html
Building relock docdocs/1705-MANHATTAN-BUILDING-RELOCK-H2.md
Parking engineering BA1705-PARKING-CODE-SCALED-SKETCH.html
Site + civil handoff1705-CIVIL-AOR-FULL-LAYOUT-HANDOFF.html
Drainage / stormwater lockdocs/1705-MANHATTAN-DRAINAGE-STORMWATER-LOCK.md
Pre-app storypre-app-send/html/00-Executive-Package.html