Multidisciplinary Charrette · Rev 3 · Permit Drawing Upgrade

Panel review of first permit set — unanimous: layout is right, sheets were too schematic for submittal. This pass adds dimensions, schedules, ADA RR, RCP, plumbing coord, and code tables. AOR still seals; PE MEP/struct/civil still separate.

Panel verdict

DisciplineGrade beforeAfter Rev 3Key fix
AOR / Plan review4/108/10 coordChain dims · door tags · G0.1 code data · finish schedule
Fire / egress5/108/10G0.2 OL table · egress diagram · door capacity matrix
Health / kitchen5/108/10A1.3 equipment schedule · cold/hot separation · handwash per cubicle
Plumbing PE3/107/10 coordM0.1 wet spine · grease · bar drain · slab sleeve notes
Efficiency / ops9/109/10Zero-waste unchanged · 28′ hood VE kept · L-bar @ expo junction

Efficiency tweaks applied (no wasted SF)

What Rev 3 added (16 sheets)

SheetNew detail
G0.1General notes · wall types · code summary
G0.2OL calc table · egress door matrix · schematic diagram
A1.1Chain dimensions · door tag bubbles · Rev 3
A1.2Roof drains · hood curb dims · OH group dim
A1.3Full equipment schedule · cubicle dims · cold/hot sep
A1.4Seat matrix with FS-1/FS-2 column
A1.5Reflected ceiling · sprinklers · hood soffit · AV rigging
A2.1–A2.4Heights AFF · materials · section dims
A3.2Enlarged RR 22×20 · ADA stall · fixture schedule
A3.5Full door schedule with hardware column
A3.6Finish schedule · VE package
M0.1Plumbing rough-in coordination plan

Open permit drawing set viewer →

Still required before permit (cannot skip)

Rev 3 is construction document coordination — enough for AOR to mark up and seal in days, not weeks. It is not a substitute for PE-stamped MEP or civil site plan.