# Structural — Bid Sheet · Maison Mirage + Commissary

**Authority:** [REV-9.5-FINAL-PROGRAM-LOCK.md](./REV-9.5-FINAL-PROGRAM-LOCK.md) · [68-MAISON-MIRAGE-LIFE-SAFETY-PLAN.md](./68-MAISON-MIRAGE-LIFE-SAFETY-PLAN.md)

---

## Structures in scope

| Structure | Size | Notes |
|-----------|------|-------|
| **Assembly hall** | **120′×80′** pad · **~6,000 SF** clear span interior | Peaked roof · **14′** eave · **~20′** peak · **center post row** (40′+40′ spans) |
| **Side containers (8)** | **8 × 40′** integrated east/west | Weld to slab · **~8′+** openings to hall · engineered headers |
| **Commissary** | **50′×50′** conventional steel | **12′–14′** eave · kitchen loads · hood collateral |
| **Front façade** | **Metal panel + roll-up doors** — modest fixed glass only (**no curtain wall · no containers**) | Wind / door coordination with AOR |

---

## Engineering scope

- [ ] Foundation design (geotech-based) for hall + containers + kitchen  
- [ ] Roof framing / PEMB or steel package — stamped calcs  
- [ ] Container connection details (weld plates, moment at openings)  
- [ ] **Louisiana wind** — enclosed assembly  
- [ ] Special inspection schedule  

---

## Excludes

- Courtyard **18** vendor containers (separate bid — [BID-CONTAINERS-FOUNDATIONS.md](./BID-CONTAINERS-FOUNDATIONS.md))  
- MEP design-build inside kitchen line (foodservice vendor)  

---

**Submit to:** partners@miragedistrictnola.com · **Subject:** `Bid — Structural — Maison Mirage`