Plan · north up · stretched bar · dimension schematic
PALM COURT · LED → STAGE → POOL
┌────────────────────────────────────────────┐
│ Hotel Rooms (Back) · L2–L3 │
│ Six Chef Hall │ Open Court │ Event Hall │ ← L1 · one PEMB shell
│ 60×60 west │ 120×40 lawn │ 75×60 · 299 │
│ Hotel L2–3 │ Grand Arrival│ Hotel L2–3 │ ← bar · concierge east
│ Retail · Retail · Retail · Retail │
└────────────────────────────────────────────┘
MANHATTAN · 35′ glass · destination first
PEMB + light-gauge steel · 3 stories · key math
| Element | System | Qty / floor |
|---|---|---|
| Guest rooms | PEMB frame + identical LGS/drywall bay | 48 total · 24 @ L2 · 24 @ L3 |
| Retail | RM-2 · 2× hotel module · 24′×28′ = 672 SF | 11 units ≈ 7,500 SF · same LGS spec |
| Restaurant | PEMB / conventional steel | L1 · wide span · hood west |
| Event pavilion | PEMB · 75′×60′ = 4,500 SF | 299 seated · A-2 · roll-ups to court |
| Restaurant | PEMB · 60×60 · 3,600 SF | L1 · stays open during events · one kitchen BOH |
| Core | Steel/stick · one elevator | Lobby · do not cut |
| Roof | Partial only · PEMB | Not over open court |
Room count: PE verifies 24/floor against real wedge + setbacks — north back row + east/west wings is the study direction on 203′ width.