Concept #2D · Open Court Resort · Layout

LOCKED Jul 2026: Partial roofs only · open palm court · PEMB + light-gauge steel (no containers) · drywall middle (Mirage + event) — no two PEMB buildings · no full atrium roof · concierge · P-S guest south · P-W staff west · PLS #8387.

2D ONLY Partial roofs Open court PEMB + LGS · no containers §40-447 · PLS #8387 120 parking
Site plan · 120 stalls · where they go · PLS #8387 bowl
MANHATTAN BLVD · 45k VPD BANK SIGN NECK · NO STALLS PORTAL P4 TOWER P-W STAFF 20 6′ ADA P-N · 28 · N01–N28 P-M · 14 · M01–M14 · mid aisle P-S · GUEST · 40 S01–S36 + ADA A01–A04 · Manhattan sees this row P-E · 18 · E01–E18 12′ POLE T-30 split → RIGHT into P-S MAIN BOWL · ~203′×155′ · Zone X · 100 stalls +P-W 20 TOTAL STRIPED · 120 4-STORY ATRIUM · OPEN VOID DRYWALL fit-out · NOT 2 buildings CONTAINER RING · L2–L4 ROOMS · ONE ROOF 40′ PORTAL @ SOUTH SPLIT · WEST RETAIL LEG · PLS ~153′ 40′ OPEN WEST LEG 50×150 LC LOBBY · CONCIERGE CLOCKWISE GUEST LOOP EXIT WEST WALK TO CONCIERGE 50′ NORTH BUFFER · PALM COURT plat says canal · field = woods · no build EAST NEIGHBOR N ↑
P-S guest · Manhattan sees full lot
P-W staff · west tower edge
Lobby · concierge · one front door
Container ring · one roof
ZoneStallsWhere on lotWho
P-S40South rows of main bowl · Manhattan-visibleGuests · hotel · Mirage · spa · court
P-N28North double-loaded rows · main bowlShop staff · hall AM prep
P-M14Center spine between aislesEmployee overflow · shift change
P-E18East strip · west of 12′ pole bandEmployee · Sat peak
P-W20West edge by P4 tower · BOH driveHotel overnight · vendors · ugly edge
Neck0Manhattan mouth · drive only§40-444 · no stalls
TOTAL120104 code min · full south bowl + west stripCrushed concrete · PE stripe

Loop: Enter east → neck ↑ → T-30 peel RIGHT into P-S → clockwise P-M → P-N → P-E → staff peel P-W optional → walk to concierge → exit west. North palm court + neck = never striped.

Ground floor · L1 · drywall fit-out inside one roof
ONE ROOF · NO 2nd BUILDING IN CENTER EVENT HALL drywall · platform · roll-ups N BARBER SALON 40′ OPENING 1 bay @ L1 · PLS south ~153′ 80′ only @ north/wider ALTA chainage SPA GLOW NAILS SHOPS EAST · face parking WEST LEG · 50×150 · §40-447(h) storefronts → E SHOPS FLANK OPENING · §40-447(h) on container faces out CONCIERGE MIRAGE · BAR · DINING drywall partitions · open to atrium above NOT a PEMB box · NOT containers KITCHEN hood · grease · solid ELEV + STAIRS container room backs · L2 start above WEST · SERVICE · BOH EAST · LOBBY EXT to Mirage to shops

LOCK: Shops on west leg + south/east flanks — not a full Manhattan strip. South gap = 40′ @ CO (PLS south split ~153′ buildable). West leg matches `site_geometry_lock.py`. Rooms stack L2+ — PE catwalk detail.

Opening width · survey lock
OptionWidthWhen
1 bay missing ★40′Default @ CO · south split ~153′ · concierge · §40-665
2 bays missing80′North bowl ~203′ only · ALTA chainage proof

L2–L4: containers continue around ring · catwalk over opening or leave void above portal — PE detail. Shops flank the gap on south + east sides.

Concierge hub · what happens here
Guest typeConcierge sends them
Hotel check-inElevator → room module · key · Wi-Fi · late checkout
Restaurant / barThrough atrium → Mirage · section · bottle · court
Spa / salonOut to Manhattan-face shop · or escort via internal path
Event ticketHall floor · wristband · parking validation
Vendor / staffWest service · P-W stall assignment · BOH
  • 1
    Arrive · park P-SGuest sees full lot · walks to one lit lobby portal.
  • 2
    Concierge greeting“Hotel, Mirage, spa, or event?” — one queue, one brand.
  • 3
    Branch inside ringUp to room · forward to Mirage · out to shop front.
  • 4
    Return to lobbySame loop out — peel west exit · never cross enter lane.
Vertical · 4-story atrium · container ring
OPEN VOID no floor slabs L2–L4 center ROOM ROOM L1 · MIRAGE + LOBBY concierge · hall floor · kitchen edge ONE ROOF · STEEL + TPO balconies F3–F4 only · face inward L4 L3 L2 L1

Guest checks in at L1 concierge, rides elevator through the **lit void**, exits at their floor into the **container ring corridor**, room door faces **inward** to the atrium — boutique resort moment without a second building.

Jefferson Parish · zero-fuss compliance matrix · Concept #2C

Authority: 1705-MANHATTAN-CONCEPT-2C-CODE-COMPLIANCE-LOCK.md · PLS #8387 · FEMA 22051C0220F · MU-CD Article XL

CodeRequirementPlan showsStatus
§40-447(k)Permanent · no temporary structuresPE slab · welded modules · one roof · one COBy-right path
§40-447(j)Retail ≥500 SF6 modules @ 640 SF (40′×16′)Exceeds min
§40-447(h)Finished metal facesSlat + glass all public elevationsRequired @ CO
§40-444(b)(1)20′ front yard · no neck parkingZero stalls in neck · landscape + driveSurvey + AE band
§40-444(b)(2)10′ side yard westWest wall @ x=10 build linePLS lock
§40-445(b)Forward-out exitWest exit throat · no ROW queueL0.2 Rev C
§40-66515′ sight trianglesEnter east + exit west · monument ≤18″ @ 3′–8′Entrance lock
§40-662 Item 22Hotel parking48 keys + 7,200/200 restaurant = 84+20 retail = 104 min
§40-662(j)All-weather surfaceEngineered crushed concrete / PICP · PE letterC-1.3
§40-443Height ≤65′ by right4-story ring ~48–52′ eaveUnder cap
§40-448One detached sign25′×25′ west lip · ≥10′ setbackNot cell tower
Hotel def.Interior lobby accessAtrium + concierge + elevatorNot motel
Zone XOccupied program in bowlNo build in AE neck · 50′ north bufferFlood truth doc
P4 pad65′×50′ leaseExcluded from build + stripeCell tower lock
PRE-APP ONE-LINER (read verbatim):

Permanent mixed-use building on MU-CD: prefabricated modular guestrooms and retail
on engineered slab, one long-span roof, open atrium, partial-height partitions for
Group A-2 dining/assembly — not temporary storage per §40-447(k). Hotel (48 keys,
interior lobby). 120 striped stalls (104 code min). Zero neck parking. §40-447(h)
finish on all public faces.

Do not submit: 150 stalls · 80′ opening @ south split · 86-min worksheet with 48 keys · raw containers · parking in neck · build on P4.

Plan · 48 keys · front / back / 2 sides · L2–L4
50′ NORTH BUFFER · PALM COURT · NO KEYS IN BUFFER BACK (north) · ~203′ · most keys per floor OPEN ATRIUM L2 catwalk · L3–L4 rail + light doors face inward · 40′ HC modules BACK · 18 total · 6/floor L3–L4 heavy WEST · 9 · L1 shops EAST · 9 · ELEV core ELEV + STAIRS 40′ VOID FRONT (south) · 12 total · 4/floor max parking · Manhattan approach · portal @ L1 P-S GUEST PARKING · 120 STRIPED N ↑ 48 KEYS 16 / floor · L2–L4
Front (south) · standard
Back + east · deluxe/top
West · shops L1 · keys L2+
40′ portal · no keys @ L1
Key count by side · by floor
SideL2L3L4TotalNotes
Front (south)44412Flank 40′ void · nearest parking
Back (north)46618Palm court view · premium ADR
West leg2339Skip over P4 / grease · L1 retail
East4339Elevator core · 12′ pole band
Per floor1616164840′ HC · 1 container = 1 key
LevelProgramKeys
L1Shops · Mirage · portal · concierge · core0
L2First guest floor · catwalk + rail16
L3Court-view deluxe · enhanced light16
L4Top floor quiet · rail “moment”16

Path: Lobby → east elevator → catwalk → room door (inward). Not 24/floor — south only ~153′ with 40′ opening; north ~203′ carries the most keys.

L2 · L3 · L4 · face load (schematic)
L2 S×4 N×4 W×2 E×4 + CORE VOID L3 S×4 N×6 DELUXE W×3 E×3 L4 S×4 N×6 TOP W×3 E×3

Each block = one 40′ guest module · doors face atrium · §40-447(h) on outer faces to parking/neighbor where exposed.

Concept #2C build lock · Jul 2026
✅ Build❌ Reject
One roof steel + TPOSecond roof over Mirage or hall
Container ring 48 rooms + shopsStick hotel skin · PEMB retail strip
Drywall middle Mirage + event + kitchen blockTwo PEMB buildings on slab
Concierge lobby one loopTen separate hotel entries
P-S guest · P-W staff westGuest parking by tower
MIDDLE FIT-OUT BUDGET · ~$180k–$280k (not ~$450k+ two shells)

  Kitchen block (hood)     ~$60k–$90k   ← solid walls only here
  Event platform + roll-ups ~$40k–$70k  ← drywall partial
  Mirage bar/dining drywall ~$50k–$80k  ← partitions + finish
  Concierge lobby            ~$25k–$40k

SAVE vs Concept #1 two PEMB: ~$250k–$450k → stays @ ~$3M cap

Authority: 1705-MANHATTAN-CONCEPT-2C-LOCK.md · Concept #1 PEMB permit set remains valid path until pre-app confirms hybrid.

Guest journey · hotel + Mirage night
  • 1
    Manhattan · turn in eastPortal · monument · neck up — queue max 4 · never on ROW.
  • 2
    T-30 split · right into P-SFull guest row visible — social proof from the street.
  • 3
    Park · walk to lobby6′ planted strip · one gold-lit concierge portal.
  • 4
    ConciergeRoom key · “Mirage opens at 5” · spa booking · event wristband.
  • 5
    BranchUp → room · or forward → Mirage atrium · or out → shop storefront.
  • 6
    Stay loopRoom → atrium rail → Mirage → courtyard · never leave property.
  • 7
    DepartClockwise loop peel west · YIELD · bank exit · valet optional peak nights.
Staff / vendor journey · hidden path
  • A
    Enter · peel to P-W westBy cell tower — cracked asphalt OK · hedge screens guest view.
  • B
    West service doorGrease · dumpster · vendor trucks · no guest loop crossing.
  • C
    BOH to kitchen / shopsBack-of-house spine · suite staff use shop rear entries.
  • D
    Hotel housekeepingLaundry module · cart path on west ring · elevator core.
ZoneStallsWho
P-S40Guests · hotel · Mirage · spa clients
P-N + P-M42Suite staff · vendors AM
P-E18Employee overflow east
P-W20Hotel overnight · BOH · west tower edge
TOTAL120104 code min · §40-662 Item 22 + retail
Step 1 · Start with survey numbers (PLS #8387 · site_geometry_lock.py)
MeasureFeetWhat it is
BUILD_W203′Max build width @ north bowl (10′ W setback → 12′ E pole)
South @ mouth~153′Narrow wedge @ portal / neck — not the main hotel mass width
PARK_FULL203′ × 155′Main south bowl · parking + building footprint band
West retail leg50′ × 150′L1 shops · guest rooms stack above on west ring
Bowl depth (west line)367′Full lot N–S · ring uses ~150′ west + ~203′ north cap
Portal @ L140′One missing container bay @ concierge · ADA path
Guest module40′ × 8′ HC1 container = 1 key · long side runs along ring wall

Rule: Count keys by dividing each ring wall length by 40′. Portal subtracts from south @ L1 only — L2/L3 still stack over retail flanking the void.

Step 2 · Draw the ring (trapezoid, not rectangle)
OPEN ATRIUM ~100′ × ~60′ working · light to roof NORTH · 203′ · 6 keys/floor SOUTH · 203′ @ main mass · 6 keys/floor over retail WEST · 150′ · 5/floor EAST · ~155′ · 5/floor 6 × ~33′-10″ bays (203÷6) 40′ void L1 only ELEV 24 KEYS / FLOOR · L2 + L3 = 48 153′ mouth is neck only · hotel ring uses 203′ south line @ retail
Guest module L2–L3
Portal void @ L1
Corner keys (2/floor)
Step 3 · Divide each wall by 40′ (show your work)
WallLengthMathKeys / floor
North (palm court) 203′ 203 ÷ 40 = 5.08 → use 6 bays @ 33′-10″ (203÷6) for premium court view 6
South (over retail) 203′ @ main mass Flanks: (203 − 40 portal) ÷ 2 = 81′-6″ each → 81.5 ÷ 40 = 2 per flank × 2 = 4 + 2 corners 6
West leg (over shops) 150′ 150 ÷ 40 = 3.75 → 4 full 40′ + 1 short bay @ 30′ (150÷5) 5
East (elev side) ~155′ − 20′ core 135 ÷ 40 = 3.38 → 3 full + 2 above/north of core 5
Corner infill Counted in south row (SW + SE @ Manhattan face) (in 6)
Per guest floor N 6 + S 6 + W 5 + E 5 = 22 ring bays · +2 corner wrap (SW/SE count as south · NW/NE as north) → 24 24
L2 + L3 24 × 2 guest floors 48 keys

153′ vs 203′: The 153′ number is the narrow neck @ portal. The hotel ring sits on the 203′ PARK_FULL width — same line as retail @ y=212. That is how you get 6 south keys, not 2.

Step 4 · Stack L1 retail → L2/L3 guest (rooms on top of shops)
MANHATTAN (south) · looking north · each [ ] = one 40′ container bay

L3  [K][K][K]  ··· void not repeated ···  [K][K][K]     ← 6 guest @ south (over L1 shops)
L2  [K][K][K]  ··· catwalk over atrium ···  [K][K][K]     ← same stack · doors face inward
L1  [S][S][S]  ══════ 40′ PORTAL ══════  [S][S][S]     ← retail · concierge · §40-447(h) face

WEST LEG (150′ deep · N–S along x=10′ setback)
L3  [K]  ← 5 keys/floor north-to-south on west ring
L2  [K]
L1  [S]  ← shop containers · storefront faces east to parking

MIDDLE (all levels): Mirage + event + kitchen stick · OPEN to roof · no L2/L3 slab in center
LevelHeight bandProgramKeys
L10′–14′6 shops · portal · Mirage · event · concierge · core0
L214′–27′First guest floor · catwalk + guardrail @ atrium24
L327′–40′Top guest floor · court-view premium north row24
Roof~40′ eaveOne TPO/steel roof over ring + middle · ~52′ max peak

3 stories total (not 4): same 48 containers as the old L2–L4 plan — you pack 24/floor instead of 16/floor. Save ≈ $150k–250k on one less catwalk level · rail · vertical MEP.

Step 5 · L2 key strip · check the addition
L2 · one floor · 24 keys N×6 = 6 S×6 W×5 E×5 6+6+5+5 = 22 +2 corner = 24 ✓ L3 identical · 24 × 2 = 48 total keys · 64-container order unchanged (48 guest + 12–16 retail + core)
Image diagram vs our wedge · same method
Their 240×150 boxOur PLS wedge
North / floor86 (203′ ÷ 6 bays)
South / floor66 (203′ mass · not 153′ neck)
West / floor55 (150′ leg)
East / floor55 (155′ − core)
Total / floor2424
Guest floorsL2 + L3L2 + L3
Total keys4848
  • 1
    Measure wallFrom ALTA / site_geometry_lock — not the full 367′ lot depth as one wall.
  • 2
    Subtract portal40′ @ L1 south only · upper floors flank the opening.
  • 3
    Divide by 40′Round down for strict HC · flex north to 33′-10″ bays if PE approves.
  • 4
    Add cornersSW + SE keys count in south row · don’t double-count N/W overlap.
  • 5
    × guest floors24 × 2 = 48 · same container PO as before.
Circulation · how guest reaches room 24 (example)
Park P-S → walk to 40′ portal @ L1 → concierge → EAST ELEVATOR → L2 catwalk (open to atrium)
→ turn WEST on north catwalk → room N-4 door (inward-facing) · ~90′ walk max · no enclosed corridor

Staff: P-W west → service door → west ring laundry module → same elevator core
Reference · Cargo88 Hotel Lusaka · industrial systems as design

Source: Cargo88 full tour (YouTube) · cargo88-hotel.com · 88-key container stack · monochrome rooms · MEP visible on purpose — not hidden behind drywall.

Mirage rule: Honest systems inside the ring + atrium · polished public face outward to Manhattan/parking per §40-447(h).

✅ Adopt · zone by zone
ZoneCargo88 moveMirage 2C lock
Guest roomNo drop ceiling · spiral/linear duct · conduit on surface · monochrome40′ HC · exposed painted duct · matte black or warm grey · king + rain head · container wall one feature wall
Atrium + catwalkIndustrial volume · systems readableOpen to roof · cable tray + sprinkler main visible · grating catwalk · one roof structure exposed
Lobby / conciergeBig modern lobby · arrival ritual · welcome drink40′ portal · concierge desk · seating in void · not a mall corridor
Corridor substituteEnclosed halls (skip)Catwalk only · guardrail · weathering steel or black steel · cheaper + more dramatic
LightingTrack / pipe-mount / industrial pendantsSurface-mounted on container soffit · no grid ceiling · warm 2700K
MEPEverything part of the lookExposed spiral supply · black iron sprinkler · conduit runs painted · mini-split / DOAS with visible line sets in soffit pocket only
PaletteMonochrome · raw + plush contrastCharcoal · warm white bedding · Mirage gold accent · polished concrete L1 public
StoryRepurposed containers · sustainabilityOwner build · one roof · adaptive reuse narrative for pre-app + social
❌ Skip from Cargo88
ItemWhy not @ 1705
Raw rust exterior @ Manhattan§40-447(h) · slat + glass public faces · finished street wall
Enclosed mall corridorsCost + dead air · catwalk + atrium is the Mirage move
88 keysCap + wedge · 48 keys · owner-operated
Tiny bath @ standardUS guest expectation · keep wet bath pod in container · still compact
Mall-embedded siteYou are the destination · palm court + parking loop
Exposed grease / kitchen MEP in guest viewType I hood stays commercial BOH west · not romanticized
Room section · 40′ HC · exposed everything (schematic)
                    ONE ROOF / deck above
  ─────────────────────────────────────────────────────────
  [ spiral duct or slot diffuser ]─────── black steel · insulated internally
  [ sprinkler branch ]────────────────── painted black · heads pendant
  [ LED track on container rib ]──────── warm light · no ceiling grid
  ┌ corrugated container wall ────────┐  ← one accent wall (raw paint or matte)
  │  KING · desk · mini-fridge        │
  │  ┌──────── wet bath pod ────────┐ │  ← prefab bath · not Cargo88-tiny
  │  │ rain · vanity · exhaust run  │ │     exhaust duct visible in bath zone OK
  │  └──────────────────────────────┘ │
  └───────────────────────────────────┘
  [ door to catwalk ] ← inward · container box frame visible at threshold

  HC interior ~8′-6″ clear — drop ceiling would eat 8–12″ · exposed MEP = taller feel + cheaper
Atrium · systems on display
        ═════ ONE ROOF (TPO on steel) ═════
              │ main supply trunk │  ← visible · painted
              │ sprinkler main    │
        ┌─────┴───────────────────┴─────┐
        │  L3 catwalk ═════════════════  │
        │  L2 catwalk ═════════════════  │  open volume
        │       MIRAGE / EVENT L1       │
        └───────────────────────────────┘

  · Cable tray along atrium long axis for power/data
  · One accent fan coil or DOAS drop at core — don’t hide it · paint it
  · String lights or industrial pendants @ catwalk level for “arrival moment”
Money + code · why this helps
TopicEffect
CostSkip drop ceilings + soffits in 48 keys · faster MEP rough-in · est. $80k–$120k vs finished ceiling approach
HeightHC ceiling is low — exposed keeps 7′+ clear under duct · feels bigger
MaintenanceHotel ops can access duct/valve without ripping ceiling
FireExposed sprinkler OK · listed heads · mains per NFPA 13 · dampers at rated walls only
AcousticsLined duct + silencer at fan · rug + bed soft goods · container insulation
Public faceOutward: slat/glass · Inward/atrium: honest industrial — split is intentional
  • 1
    Spec one finish paletteMatte black MEP · warm grey container paint · brass door numbers · same in all 48 keys.
  • 2
    Prefab room kitBath pod + furniture + exposed duct layout = one container shop drawing · repeat 48×.
  • 3
    Atrium is the lobby photoCargo88 lobby energy · your void is bigger · concierge + catwalk + visible roof structure.
Concept #2D · Open Court Resort · partial roofs · open sky

Direction lock Jul 2026 · Rev 5: Destination first — NOT hotel-first lobby. One PEMB shell · zones inside one roof: Six Chef Hall 60×60 west · Event Hall 75×60 · 299 seated east (LOCKED · separate from chef hall) · Grand Arrival Hall @ Manhattan with 35′ glass · concierge in east side alcove · event lawn + LED north · cloud kitchen 42×30 NW BOH.

Sound zones · DJ & violinist without ruining dinner

Some people want a DJ. Some want quiet dinner. Two separate roofs solve it — not one room where everyone is stuck with the same vibe.

ZoneMusicGuest
West restaurantQuiet dining · optional acoustic violin @ low volume“No club” · families · date night
East event · 299 seatsDJ · band · wedding violinist + playbackWeddings · quince · corporate · buyouts
Open court · event lawn200+ on turf · fire pits · DJ faces north LEDSaints · weddings · hotel balconies watch north
Hotel keysQuiet Keys (back/north) vs Event View (court)Guest picks at booking

@ 5 PM events start east · restaurant stays open west · roll-ups seal sound between pavilions · Saints/LSU/UFC = court HQ nights (game on court + east · quiet west) · Full sound lock →

L1 plan · wedge · what gets roof vs open sky
WEDGE BOWL · PLS #8387 · NOT A RECTANGLE OPEN SKY PALM COURT · ~8–10k SF 15–20% PERGOLA · shade only PLUNGE 15×35 SIX CHEF HALL 60×60 · 6 concepts cloud kitchen BOH NW EVENT HALL 75×60 · 299 seats LOCKED · NOT chef hall GRAND ARRIVAL HALL 35′ glass · bar · court vista concierge → east alcove RETAIL · ROOFED SHOPS L2–L3 HOTEL · PEMB + LGS · open catwalks overlook court MIRAGE · DISTRICT · Dine · Stay · Gather MANHATTAN BLVD ↓ · 35′ glass · destination first · NOT hotel check-in desk Roofed pavilion Open sky LGS retail

Destination moment: Guest walks through 35′ glass into Grand Arrival Hall — cocktails · bar · court vista · Six Chef Hall left · Event Hall right · concierge off to the east side.

Section · N–S cut · partial roof vs full roof (2C)
2C one roof (removed) PARTIAL ROOFS ONLY · ~22–26k SF OPEN SKY no steel · no TPO · no HVAC in void L3 · open catwalk + overhang at doors L2 · 24 keys/floor · inward-facing doors LGS BAY LGS BAY L1 · court level · dining spills out L3 L2 L1 −$150k–$250k

Hotel guests step out of their room onto an open-air catwalk overlooking the court — Bal Harbour / Surf Club energy, not enclosed corridor hotel.

Twilight court · guest experience (schematic)
HOTEL L2–L3 REST · EVENT EVENT LAWN · TURF · 200+ LED WALL · 28′ · FACES SOUTH STAGE POOL 25×50 · BACKDROP MIRAGE · DISTRICT Dine · Stay · Gather DINE LOUNGE · BAR REAL SKY · REAL PALMS · REAL RESORT

Reference vibe: Bal Harbour / Four Seasons Surf Club twilight courtyard — white stone, gold Mirage sign, palms, strings, dine/lounge/bar spilling into the court.

2C vs 2D · money + look
2C · one roof2D · open court ★
Roof area~28–32k SF entire ring~22–26k SF pavilions only
CenterEnclosed atrium voidEvent lawn · LED @ north · pool backdrop
FeelHotel-atrium / mallResort courtyard
Steel + TPOHigher−$80k–$120k
MEP in voidFull HVAC + sprinkler−$70k–$130k (outdoor court)
Total save~$150k–$250k
Land @ $425kPushes capSave covers bump
ReinvestPergola · palms · pool · sign · screen
Build lock · Concept #2D
  • 1
    One PEMB shellSix Chef Hall 60×60 west · Event Hall 75×60 east · 299 seated LOCKED · court between · NOT one giant hall.
  • 2
    Grand Arrival Hall35′ glass @ Manhattan · bar · cocktails · court vista · concierge east alcove · NOT hotel-first.
  • 3
    Event lawn in the middle120×40 turf · fire pits · look north to LED → stage → pool backdrop.
  • 4
    Hotel L2–L348 keys · PEMB + LGS · part of the experience · not the whole identity.
  • 5
    Revenue mix40–60% F&B/watch · 20–30% events · 20–30% hotel · design follows F&B + events.
Concept #2D · Stretched bar · 3 stories · $3M cap · 48 keys · no phase

Redesign the building around budget — do not phase. L1: restaurant pavilion 60×60 + event pavilion 75×60 (299 seated) + lobby/core + retail (LGS). L2–L3: 24 keys each · PEMB + repeating LGS bays. Open court center · palm court north. One elevator · one kitchen. No containers.

Full plan + cost model

→ Stretched 3-story dimensioned schematic
→ $3M line-by-line cost model (owner-build vs market)
→ PEMB prefab engineering packet (13 sheets · specs · CA)
→ Build lock doc

                    PALM COURT · LED → POOL
┌────────────────────────────────────────────┐
│ Hotel Rooms (Back) · L2–L3                 │
│ Six Chef Hall │  Open Court  │  Event Hall  │  L1 · one shell
│ 60×60 west    │  event lawn  │  75×60 · 299  │
│ Hotel L2–3    │ Grand Arrival│  Hotel L2–3   │  bar · concierge east
│ Retail · Retail · Retail · Retail           │
└────────────────────────────────────────────┘
     MANHATTAN · 35′ glass · destination first