Civil / Site / Drainage Bid Form

Lot Z · Phase 1A · REV 7.7 district · REV 9.5 building pad

LineScope$
1ALTA/topo coordination (surveyor separate)
2Phase 1 grading ~5 AC · crown P-SOUTH · swales
3Stormwater Ch. 121 · ~22,688 CF · bioswale · detention
4Fire lanes 20′ min · 26′ entry/hammerhead · north 60′ hammerhead
5Parking ~300 stalls Phase 1 striping
6Utilities to Maison 120×80 · commissary 50×50 · vendor pads
73,000 gal grease interceptor + commissary tie-in
8120×80 power-trowel slab · container weld plates
918 courtyard vendor foundations (10′ separation)
10Stamped C0.1, C1.1, C2.1 · reports · permits