Lot Z · Pre-permit · Phase 1A

Project hub

One clean document package for investors, architects, engineers, and bidders. Start at the package README — then follow your role’s read order. No password.

Start here (fixes the “mess of docs” problem)

Older revisions (7.5 · 9.2 · L-core) are mixed in folders. Only read documents in the order below.

Open docs/README.md — package map Obsolete list: DO-NOT-BID.md

Investors & lenders 8 documents · fixed order · ~$1.857M stack · five-year model Architects & engineers 17 steps · drawings · bids · stamp path · REV 9.5 + 7.7
Drawings are coordination only — not construction-stamped until Louisiana AOR/PE seal. Do not use L-core or REV 9.2 sheets.

Engineers & bidders — four steps

1
Read program locks

AOR diligence package · REV 9.5 · REV 7.7

2
Open coordination drawings

Stamp index · Full REV 9.5 packet · Lot Z survey PDF

3
Submit bid online

GC · AOR · Structural · MEP · Civil · Foodservice · Containers

4
Contract exhibits

Insurance · bonds · liens · GC lean scope: Lean Phase 1A

Current program (one table)

ElementSpecification
Maison hall120′×80′ · ~6,000 SF open · full NFPA 13 · CO ~280
South frontMetal + roll-up doors (lean) — no grand glass curtain wall
Side walls8 × 40′ containers = rooms + structure (Version 2)
Commissary50′×50′ conventional rear · Type I · not containers
Courtyard18 vendors · no stage · no CUDO · lean open: 6 Day 1
Capital (full)~$1,857,000 deployed · one table

Investors

Do not read random markdown files. Use the investor package only.

Authority drawings only

Superseded (do not use): L-core sheets · REV 9.2 packet

Founding vendors & kitchen

← miragedistrictnola.com · Package README · partners@miragedistrictnola.com