Lot Z · Pre-permit · Phase 1A
Project hub
One clean document package for investors, architects, engineers, and bidders. Start at the package README — then follow your role’s read order. No password.
Start here (fixes the “mess of docs” problem)
Older revisions (7.5 · 9.2 · L-core) are mixed in folders. Only read documents in the order below.
Open docs/README.md — package map Obsolete list: DO-NOT-BID.md
Investors & lenders
8 documents · fixed order · ~$1.857M stack · five-year model
Architects & engineers
17 steps · drawings · bids · stamp path · REV 9.5 + 7.7
Drawings are coordination only — not construction-stamped until Louisiana AOR/PE seal. Do not use L-core or REV 9.2 sheets.
Engineers & bidders — four steps
1
Read program locks
2
Open coordination drawings
3
Submit bid online
GC · AOR · Structural · MEP · Civil · Foodservice · Containers
4
Contract exhibits
Insurance · bonds · liens · GC lean scope: Lean Phase 1A
Current program (one table)
| Element | Specification |
|---|---|
| Maison hall | 120′×80′ · ~6,000 SF open · full NFPA 13 · CO ~280 |
| South front | Metal + roll-up doors (lean) — no grand glass curtain wall |
| Side walls | 8 × 40′ containers = rooms + structure (Version 2) |
| Commissary | 50′×50′ conventional rear · Type I · not containers |
| Courtyard | 18 vendors · no stage · no CUDO · lean open: 6 Day 1 |
| Capital (full) | ~$1,857,000 deployed · one table |
Investors
Do not read random markdown files. Use the investor package only.
Authority drawings only
Superseded (do not use): L-core sheets · REV 9.2 packet
Founding vendors & kitchen
← miragedistrictnola.com · Package README · partners@miragedistrictnola.com