Full buildings · Mirage Grand Arrival ~$45k · land $350k max · ~$1.265M all-in · STOCK openings.
✓ H7 · 45k cars/day strategy · perception over concrete · full hall + 10 retail @ CO
| # | Sheet | Discipline | Status |
|---|---|---|---|
| 1 | G0.1 | Code summary · IBC · MU-CD | Complete |
| 2 | G0.2 | Life safety · OL 299 · egress | Complete |
| 3 | S0.1 | Structural PEMB · foundation · wind | Complete |
| 4 | M0.0 | MEP discipline index · E/P/M/FP | Complete |
| 5 | A0.1 | Site plan · all buildings | Complete |
| 6–10 | A1.1 · A1.6–A1.8 · A1.2–A1.3 · A0.COURT | Floor plans · hall FF&E · court FF&E · retail · kitchen · court zones | Complete |
| 11–12 | A1.4–A1.5 | Roof · reflected ceiling | Complete |
| 13–15 | A2.1–A2.3 | Elevations · building sections | Complete |
| 16–21 | A3.1–A3.7 | Wall · ADA · windows · doors STOCK · finishes · details | Complete |
| 22 | A4.1 | Signage · monument · directionals · traffic · menus | Complete |
| 23 | B-PARK | Parking worksheet · 86 min | Complete |
| Architect of Record | All architectural sheets G0–A3 | Seal block on every sheet |
| Structural PE | S0.1 + PEMB mfr stamped calcs | Seal block on S0.1 |
| MEP PE | M0.0 + E/P/M/FP sheets | Seal block on M0.0 |
| Civil PE | Companion parking REV BA | Separate volume |