Concept #2 · Rev B · Jul 2026 · Working

Mirage Social Resort

Hybrid container boutique hotel + enclosed atrium + Mirage restaurant + 6 Manhattan shops. Bridge-adjacent — ~5 min to Crescent City Connection · ~10 min to the French Quarter. ~$3M all-in · hotel add ~$1.5M.

Investor line: “48 keys in a container ring around a 4-story indoor atrium. Mirage is the demand engine. NOLA peak nights at $179–$249. Hotel take-home ~$45k/mo stabilized after hotel opex and hotel share of the loan — not 5-star CBD, but bridge-adjacent overflow the West Bank doesn’t have yet.”

48Hotel keys
64Containers @ $2k
~$3MAll-in cap
~$45kHotel net/mo · Likely

Location

FactSpec
Site1705 Manhattan Blvd · Harvey · MU-CD · PLS #8387 · ~1.89 ac
CorridorManhattan & Westbank Expressway · ~45,000 VPD · Target / Fountain Park Centre
To Crescent City Connection~3–5 min
To CBD / French Quarter~8–12 min · ~7 mi
Peak demandMardi Gras · Jazz Fest · Saints · Jefferson ~95% hotel occ carnival weekends

Massing · hybrid build

MANHATTAN BLVD
[Shop][Shop][Shop][Shop][Shop][Shop]   ← 6 bays · 2×40′ HC each ≈640 SF
────────────────────────────────────
        HOTEL LOBBY · 4-STORY ATRIUM
        (container faces in · one roof)
────────────────────────────────────
           MIRAGE RESTAURANT          ← conventional open span · NOT containers
────────────────────────────────────
      Sports bar  →  Palm Court (east)

Upper floors: 48 room modules · open void center · balconies F3–F4 only

Containers where it repeats. Conventional steel/PEMB where you need wide gathering space. One low-slope roof over the entire footprint — not a glass mall dome.

Container matrix

UseQtyShell @ $2k
Guest rooms (40′ HC)48$96,000
Retail (6 suites × 2)12$24,000
Stairs · MECH · laundry4$8,000
Total64$128,000

Capital · $3M all-in

Use$
Land (max)350,000
Hotel add (48 keys · stack · roof/MEP share)1,500,000
Mirage · lobby · 6 shops · site · parking · soft1,150,000
Total3,000,000
Source$
A&C loan2,750,000
Sponsor cash250,000

Saves ~$1M–$1.5M vs stick-built 48-key resort. Container path is the budget unlock — not luxury finishes @ CO.

Hotel only · monthly (after opex + hotel loan)

Hotel share of loan ~$1.375M · P&I ~$10,300/mo. Excludes Mirage bar and retail.

TierADR · OccGross/moNet/mo
Year 1 ramp$125 · 55%~$103k~$25k
Downside$115 · 52%~$86k~$18k
Likely · NOLA peaks in mix$138 · 66%~$133k~$45k
Strong · festival years$155 · 72%~$163k~$61k
Peak season (55–70 nights/yr)OccADR
Mardi Gras · Jazz Fest · Saints · conventions90–100%$179–$249

Concept vs Concept

Concept #1 · Mirage District

~$1.27M all-in · 2 PEMB buildings · 10 retail · no hotel. Active permit path. ~$83k–$100k/mo operator NET stabilized. Best for minimal cash + bank.

Open Concept #1 →

Concept #2 · Mirage Social Resort

~$3M all-in · 48 keys · atrium · 6 shops. Bridge-adjacent NOLA overflow. Hotel ~$45k/mo net + Mirage + retail upside. Pre-app pivot.

CO vs Phase 2

@ Certificate of occupancyDefer to NOI
48 keys · 6 retail shells · Mirage shell · one TPO roofWing → 72–80 keys
Exposed container atrium · balconies F3–F4Chandelier · skylights · glass elevator
Soft Palm Court (strings · turf)Hardscape · stage · screen

Honest positioning

1705 Manhattan Blvd · Harvey · Jefferson Parish only · Does not supersede PEMB permit set until Planning confirms hybrid path.