Concept #2C · One Roof · Ring · Drywall Middle

48 keys · container ring · one roof · Mirage + event hall = drywall fit-out inside — not two buildings on slab · lobby loop · ~$3M.

Build lock: One roof over the whole asset. Container ring = walls. Middle = partial drywall + kitchen hood + event platform — no second PEMB shell · no second hall building.
        ═════ ONE ROOF · ONE BUILDING ═════
        ║ □ □ □ □ □ □  shops out · containers
        ║ □  ┌─kitchen─┐  event · drywall  □
        ║ □  │  hood   │  roll-ups north   □  ← NOT 2 buildings
        ║ □  └─────────┴── MIRAGE · BAR ── □
        ║ □ □ □ CONCIERGE □ □ □ □ □ □ □ □ □
        ═══════════════════════════════════
     P-S guest parking south · P-W staff west · tower

★ Your aerial · lobby loop

Yellow-outline lot · one roof · parking · concierge · toggle layers.

Schematic · 6 tabs

Site loop · ground floor · atrium · journey · build lock · code matrix.

Code compliance lock

Jefferson §40-447 · §40-662 · survey · parking · pre-app one-liner · zero-fuss checklist.

Concept #2C lock (markdown)

Build rules · capital · pre-app line · instant reject list.

Concept #2 · investor stack

Hotel NOI · $3M cap · bridge-adjacent positioning.

DoDon't
One roof + container ringTwo PEMB buildings in center
Drywall Mirage + event insideFull hall shell + own roof
Concierge · one lobby loopSeparate hotel building skin
Shops = containers face out150′ PEMB retail strip