Lot Z · AOR / PE stamp path

Stamp package index

Honest status for permit. Owner provides coordination geometry + program lock. Licensed AOR/PE trace on ALTA, add details, and seal. Nothing on this site is a construction stamp until signed.

Not stampable as-is: Old L-core A0.1/A1.1 sheets, empty PDF downloads, markdown-only stubs without AOR CAD trace, and schematic SVG without door schedules / wall types / ALTA dimensions.
May 2026 upgrade: REV 9.5 A1.1/A1.2, new A0.1 (Maison not L-core), FS1.1 life safety sheet — title blocks, dimensions, notes, supersede warnings. AOR traces these into CAD at 1/4"=1' and seals.
Open coordination drawing set A1.1 floor (authority) Lot Z survey (ALTA base) Submit AOR bid online

Sheet index — what to stamp

SheetStatusWho stampsOpen
A1.1 Maison floor REV 9.5 Owner coordAOR trace LA AOR + Structural PE + MEP View
A1.2 Maison elevations REV 9.5 Owner coordAOR trace LA AOR View
A0.1 Site plan REV 9.5 + 7.7 Owner coord → trace on ALTA AOR + Civil PE View REV 9.5
A0.1 Prelim (L-core) Superseded Do not stamp Archive only
A0.2 Parking Prelim → AOR/Civil AOR + Civil View
A0.3 Courtyard containers Stub — AOR from REV 7.7 SVG AOR Spec · REV 7.7 site
A2.1 Fire access Prelim AOR + Fire marshal coord View
A3.1 Drainage Civil stub Civil PE Drainage v5 PNG
FS1.1 Life safety Owner coord → FPE/AOR FPE + AOR · Doc 68 View
FP1.1 Sprinkler hydraulic FPE deliver LA FPE Scope
M / P / E MEP deliver MEP PE Bid scope
S Structural PE deliver Structural PE Bid scope
A1.1/A1.2 L-core Superseded Do not stamp

Cover note (every sheet until stamped)

OWNER-PREPARED PRELIMINARY — FOR COORDINATION AND PROFESSIONAL SEAL ONLY.
NOT FOR CONSTRUCTION UNTIL STAMPED BY LOUISIANA LICENSED AOR/PE.
BUILDING: REV 9.5 MAISON MIRAGE · DISTRICT: REV 7.7 (18 CONTAINERS · NO STAGE).

AOR deliverables (what “stampable” means)

← Project hub · partners@miragedistrictnola.com